Friday, December 19, 2008

A heavy rain was directed into the bulkhead by poor grading. It was no consolation to me but the contractor's generator was in the basement.

After weather delays the trusses are up and 2 walls of the garage. Some of the perlins are in place on the trusses.

Wednesday, December 10, 2008

This view from the upstaris shows one of the posts that will support the trusses.

The front deck is complete except for the railing. The temp rose above freezing then it began raining. The dumpster has about 2 ft of water and will need pumped out before it freezes agian.

This is the view from the doorway of the upstairs bedroom and bathroom. Notice the opening for the basement stairs. Also the groove at the loft deck level in the logs. This is where wiring for the loft area outlets will be run.


The trusses are assembled and should be put in place next.