
The garage is partially framed. The rafters are cut but not yet erected. The carpenter hoped to get the roof on but the window of good weather was too short. He took the tarps off then put them back.

Here is the skylight which will be in the upstairs bedroom. The window unit was back ordered. Not on site yet.

The only roof is Tounge and groove 1X8. This will be what you see from inside. on top of that will be foam insulation and the sheathing and shingles.

Sheathing is on the gable end. Next will be log siding then the windows can go in. These windows face Northwest and let in a lot of snow.