Thursday, April 30, 2009

The top of the log wall is horizontal and the cieling meets it at one point. This space must be caulked insulated and covered. We cut 100 pieces with an angle at the top and the right height to cover the space between the top of the log wall and the ceiling.


Here is the space before calking is done. Light can be seen through the crack.


This is the stair landing. There will be 3 steps up to the landing. You can see the stair nose on the left side of the landing. The stair will then turn to the right and have 11 more steps to the loft.




We measured carfully for the stairs and discovered that the loft that makes the top step is not level by about 1/4 inch over 3 feet. We will need to adjust the stairs to bring them off level in several steps