A wire needed to be run from the outlet box near the front door to where the ceiling fan will be on the ridge beam. I drilled a hole in the ridge then pushed a wire through. I pulled it along the ridge and down through the front gable which is frame and log siding. Below the gable the logs were drilled for the wire.
Here is the view from the front balcony above the front door.

Roof sheathing is complete but shingles are not yet installed. Underground electric service was installed. The box in the basement has 1 breaker for 2 outlets for construction power. I will be able to run the rough electric myself.


To get power to the loft outlets I routed a groove in a beam above the first floor bedroom to a groove in the log wall where the loft floor will insert.








A tunnel between the loft and the future bedroom over the garage and a dormer that will contain the upstairs bathroom.





Two windows above the garage, 2 skylights are not yet installed but onsite. A small window in the downstairs bedroom is still on order and will not be delivered for 2 weeks.