The fill is in the garage ready to pour the slab.
This is looking forward from kitchen to living room.
A second delivery from the log supplier arrived Friday 11/21/08. Included were the steel plates to assemble the timber trusses. These need to be grinded, primed, and painted by Monday 11/24/08. Temperatures were 20 to 30 degrees. To do this we used a wire brush on a drill motor, wiped with paint thinner, heated on a gas grill, and spray painted outside. After dark we painted with a roller inside.